Pro calculators
Groundworks
How many trips for my excavation spoil?
Trench, excavation, ground reduction: the volume once dug, its weight and the number of trips with a CIL tipper.
1Your excavation
Replaces length × width × depth if entered.
Once dug, soil takes up more space: 1 m³ in situ gives this volume in the tipper. Indicative average.
Indicative average, loose. Wet soil weighs more.
2Your tipper
Your available payload, with crew and tools on board. To find it: the “How much can I load?” calculator.
To see whether weight or space is the limit.
Volume to remove
— m³
With your tipper
—
Indicative result. Bulking and weight depend on the soil, its moisture and how it is dug: if in doubt, have your first load weighed.
The number of trips respects the weight you entered: never exceed your truck’s GVW, nor the permitted load on each axle. Check where you can take your spoil: recycling centre or authorised site.
What payload can a 3.5 tonne tipper truck carry?
Discover the CIL tipper
An oversized cylinder3-stage telescopic Ø110/90/75/60, up to 47.7° tipping angle.See the tipping
The CIL tipper, built to lastEvery part shot-blasted then phosphated, painted or powder-coated.See the construction
The new 2027 model in picturesLowered, raised, emptied: the CIL tipper from every angle.See the picturesA project? Need a
tipper? A question?
Write to us or call us: we will get back to you quickly.
Request a quote